LIST OF COMPLETED PROJECT UNDER SHERPUR O&M SUB-DIVISION, BWDB, SHERPUR

 

 

SL. No

Name of Project

Location

Period

PP cost/cost

(Lakh)

Type of Project

Project area

(Ha)

Benefited area

Major component of Project

Remarks

Upazilla

Dist

Starting

Completion

Irrigation

Drainage

Flood control

Total

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

1.

Ghugurakandi –Betmari & Khunua Beltoli Sub-Project

Sherpur Sadar

Sherpur

1997-98

2000-01

450.00

F.C

-

-

-

4000

4000

Embankment

a) Ghugura kandi-Betmari=13.00km

b) Khunua Beltoli =7.00km

Design crest width =5.00m, level=18.75m to 17.50m

Design crest width =5.00m, level=17.75m to 17.25m

2.

MirgiRiverSystem

-Do-

-Do-

1981

82

38.00

FCD

300

 

 

 

300

 

 

3.

Marashi river sub-project

Jhenaigati

-Do-

1996-97

2001-02

200.00

F.C

-

-

-

2500

2500

Embankment =10.00km

 

4.

Flood control embankment of both bank of Marashi river from shandhakura to Bogadubi sub Project.

-Do-

-Do-

2005-06

-

377.08

F.C

-

-

-

-

-

Embankment =30.00km

Completed 6.00km,

Cost 60.00 lakh tk.

5.

MalijheeRiver Bridgecum regulator scheme

-Do-

-Do-

1984-85

1986-87

46.00

Irrigation

3400

1760

500

578

2834

a) Regulator = 1 No (7 vent)

 

6.

Chillakhali river system

Sub-Project.

Nalitabari

-Do-

1984-85

1986-87

560.00

FCDI

1970

902

600

502

1604

a) Embankment= 16x2 =32  km

b)  W.C.S=33 vent

c) Irrigation inlet 8 Nos.

Design crest level =17.60 to 30.00

Design crest width =4.25 m

7.

River Bank Protection project of U/S & D/S of Taraganj Bridge at Palpara & Khal vanga from erosion of Bhogai river

-Do-

-Do-

2005-06

2006-07

350.00

River Bank Protection Project

-

-

-

-

-

River bank Protection work = 1.150 km

Completed 325 m,

Cost = 100 lakh tk

8.

NalitabariTownProtection Project.

-Do-

-Do-

1993-94

1999-2000

255.95

River bank protection

-

-

-

-

-

a) River bank protection = 1.30 km

b) Embankment 20.00 km

Completed 1.30 km bank protective work.

9.

North Mymensingh Tube-well Project

-Do-

-Do-

1950-60

1969-70

10.00

Irrigation

50

50

-

-

50

a) Deep tube well- 1No

b) Irrigation canal = 0.50 km

Completed

10.

Protection of Nakugao Immigration check post form erosion of left bank of Bhogai river on Nakugao-Sherpur Road

-Do-

-Do-

2007-08

2009-10

342.00

River bank protection

-

-

-

-

-

River bank Protection work = 0.485 km

Completed

11.

Bhogai river Sub-Project

-Do-

-Do-

1993-94

1997-200

244.00

FCD

1500

 

 

 

1500

a) Embankment= 23.80  km

b) Drainage Regulator 2 Nos.

Completed

12.

Flood control embankment of Right bank of Malijhee river sub-project form purba Dhamna to Nakhla Bazar & Baitkamari bridge to Boleshswari river.

Nakhla

-Do-

2005-06

2006-07

288.10

F.C

-

-

-

400

400

Total Embankment length=12.00km

Completed =2.00 km,

Cost =50.00 lakh tk

13.

Jankipur Khal Regulator Sub-Project

-Do-

-Do-

1979

1980

37.81

FCDI

300

 

 

 

300

a) Embankment= 0.37  km

b) Drainage Channel =3.30km

c) regulator = 1 no.